Ball mill operating instruction
Author : RuiGuang Time : 2013-10-16 Click :
Ball mill operating instruction
1 Before working , confirm the mechanical and electrical parts are good, check the connecting bolts are loose ; lubricate all lubrication points are normal, if normal and reliable transmission device , guards intact, electrical instruments are sensitive , motor brush contact.
2 , turning one week , check the device without moving parts or around obstacles and eliminate . Allowed to stand around at startup .
3 , After the check , press the start button to start the motor , note current changes. Ball machine no more than two consecutive start , the first and second every 5 minutes or more, if the third starter , and we must electrician, fitter cooperate with the inspection , before starting . Not the same with other devices , the staggered start to avoid tripping.
4, after the ball mill normal operation normally , we must strictly follow water supply, to the mining, steel balls added provision prohibiting overload, idle time is not more than 15 minutes , so as not to bash liner .
5 , the operation should be careful to check whether the leakage of plasma cylinder , carefully observe the current, voltage , feeding , water supply is normal, check once every half hour and the spindle motor temperature not greater than 60 ° С, identify problems and timely treatment .
6, running to observe the hollow shaft , the oil ring is rotating with oil , the hollow shaft temperature is normal , if found hollow shaft fever, close to Burnt , should take immediate measures forced cooling may not stop immediately , so as to avoid " axle . " While paying attention to check the lubrication oil , temperature , time refueling.
7 , Before stop working , first stop the mining supply, when the ore inside is processed, stop water supply . Press the stop button , pull down the gates .